Building Permits in ZIP 10023
Manhattan, NY — 1,034 permits filed recently
1,034 permits
Installation of suspended scaffold for facade work or inspection
Installation of temp tents, no alt to exist structures for Annual NYC Half Marathon. TPA required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upo...
Filing herewith general construction for non-structural demolition aka removal scope of planters, benches, trees, etc. at garage roof - plaza level (Damrosch Park) as per plans. No change in use, occu...
Filing herewith civil scope for non-structural demolition aka removal scope of planters, benches, trees, etc. at garage roof - plaza level (Damrosch Park) as per plans. No change in use, occupancy, or...
Renovation of apt 3d consisting of gc and mh work filed in conjunction with dob now pl.. no change to use, occupancy or egress.
Installation of suspended scaffold for facade work or inspection . Amend #1 , adding scaffolding drops and outrigger details
Filing herewith structural partial demolition scope inside garage/parking structure and at the garage/parking structure roof/plaza level which includes a slab cut as per plans. No change in use, occup...
Renovation of apt 3d consisting of gc and mh work filed in conjunction with dob now pl.. no change to use, occupancy or egress.
Installation of temp tents, no alt to exist structures for Annual NYC Half Marathon. TPA required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upo...
Install new 4 level supported scaffolding to allow the repair of the existing chimney liners as per plans, no change in use occupancy or egress
General construction related to the renovation of an existing retail space (chocolate store) in the cellar and first floor. No change to use, egress, or occupancy.
Installation of suspended scaffold for facade work or inspection
Filing herewith structural partial demolition scope inside garage/parking structure and at the garage/parking structure roof/plaza level which includes a slab cut as per plans. No change in use, occup...
Installation of suspended scaffold for facade work or inspection . Amend #1 , adding scaffolding drops and outrigger details
Filing herewith general construction for non-structural demolition aka removal scope of planters, benches, trees, etc. at garage roof - plaza level (Damrosch Park) as per plans. No change in use, occu...
Filing gc for new partition and replacement of appliances and fixtures. scope of work is limited to unit 25d and there is no change in egress, use, or occupancy.
Plumbing work related to the interior renovation of apt. 8c on the 8th floor. no change to use, egress, or occupancy.
Filing herewith civil scope for non-structural demolition aka removal scope of planters, benches, trees, etc. at garage roof - plaza level (Damrosch Park) as per plans. No change in use, occupancy, or...
Installation of ada compliant fixtures, local tmv at new lavs / sinks, sump pump at elevations,
structural framing work associated with the townhouse renovation as shown on the plans filed herewith. No change to use, egress, or occupancy.