Roofing Permit — 140 WEST 65 STREET
Roofing
$34,900,658
Turner Construction Compa
Darren Robertson
New York County
Work Description
Filing herewith structural partial demolition scope inside garage/parking structure and at the garage/parking structure roof/plaza level which includes a slab cut as per plans. No change in use, occupancy, or egress proposed under this application.
Other permits at this address
10 other permits at 140 WEST 65 STREET. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Temporary structures for a red carpet at JRP plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
Filing for repairs to this existing parking garage. No change to use, egress or occupancy.
Filing herewith plumbing demolition inside the garage/parking structure to make way for new theater building/structure as per plans. No change in use, occupancy, or egress under this application.
Phase 2: Partial Demolition Means & Methods for park and garage/parking structure as per plans.
Phase 2: Partial Demolition Means & Methods for park and garage/parking structure as per plans.
Temporary structures for a red carpet at JRP plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
Temporary structures for a red carpet at JRP plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
Filing herewith structural scope for the removal of the historical Guggenheim bandshell. No change in use, occupancy, or egress under this application.
Filing herewith structural scope for the removal of the historical Guggenheim bandshell. No change in use, occupancy, or egress under this application.
Use of Mechanical demolition equipment during partial demolition, filed separately under M01299014-S5.
More Roofing permits in Manhattan
Facade repairs including the replacement of roof pavers as indicated on the plans filed herewith. no change in use, egress or occupancy.
Modification of mechanical systems on parts of Sub Cellar, Cellar, mezzanine, 23, 24, 51, 52 and Roof as indicated on attached plans. There is no change in occupancy, use or egress.
Interior removal of walls, doors, floor finishes, and ceilings on all floors; removal of windows and non-structural masonry wall infill; roof waterproof membrane assembly to the existing roof slab; an...
Installation of existing deployable stage roof, temporary performance platform, bleachers, decking, tenting. No alteration to existing structures for Summer Stage Concerts. A TPA permit is required.
Filing herewith administrative application illustrating structural slab openings at lower and upper concourse and at garage roof/plaza level (at Damrosch Park) to make way for new theater building/str...