Building Permits in ZIP 10023
Manhattan, NY — 1,042 permits filed recently
1,042 permits
Modification/addition to existing HVAC ductwork and related piping as shown on drawings. No change in use, egress or occupancy.
Installation of outriggers for facade repair and inspection
Subsequent plumbing for apartment renovation unit 7ab.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Garage repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
Installation of one (1) new cooling tower and modular electric chillers on new concrete pads. no change to use, egress, or occupancy.
Installation of a convenience door between dwelling units 71 & 72 as per plans filed herewith. No change to use egress or occupancy.
Installation of outriggers for facade repair and inspection
Replace brickwork and copingstones, spot pointing of masonry, miscellaneous caulking, wire brush and repaint existing fire escape.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Interior renovation of apartment 12a on the 12th floor. no change to use, egress, or occupancy.
Subsequent plumbing for apartment renovation unit 7ab.
Modification/addition to existing HVAC ductwork and related piping as shown on drawings. No change in use, egress or occupancy.
Garage repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
Installation of new chimney liner and chimney liner extension within existing masonry chimney. no change to use, egress, or occupancy.
full demolition of 22 story structure using hand held and mechanical equipment to assist.
Removal of interior wall and floor finishes, removal of abandoned water tank in existing 6th floor stair bathroom/locker room. No change in occupancy, use or egress.
Removal of existing finishes and non load bearing partitions as per plan. all work is interior only.
full demolition of 22 story structure using hand held and mechanical equipment to assist.
Removal of interior wall and floor finishes, removal of abandoned water tank in existing 6th floor stair bathroom/locker room. No change in occupancy, use or egress.