Building Permits in ZIP 10017
Manhattan, NY — 462 permits filed recently
462 permits
Plumbing work as shown on plans filed herewith.
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
Sprinkler work as shown on plans filed herewith.
Installation of new sprinkler heads and associated piping on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system and associated ducts and piping on the 32nd Floor (EQT), as per plans. No change to use, egress, or occupancy.
FISP INSPECTION (Facade Inspection Safety Program)INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANSDesignated Primary Site supervisor: Jesus Decola
Mechanical modifications to take place on the 20th floor as per plans filed herewith. No Change in use, egress, or occupancy.
Installation of 7,000 lb dual personnel hoist cars as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Interior renovation of the 32nd Floor (EQT Partners), including interior partitions, doors, ceilings and finishes, as per plans. No change to use, egress, or occupancy.
Structural framing and stair opening, as per plans. No change to use, egress, or occupancy.
Install and register one ac for the 1st floor restaurant. no change in use, egress or occupancy.
Propose to install new non-illuminated stainless steel letters on aluminum raceway for existing commercial space at 1st floor. no change to use, egress or occupancy.
Interior renovation of exisitng UG6 Easting and drinking establishment as per plan. Removal of interior finishes and, interior construction and new door on storefront as per plan. No change to use, eg...
Conversion of dominant occupancy of building from offices to R-2 residential in accordance with the provisions of ZR Article I Chapter 5.
Plumbing modifications taking place on the 16th floor as per plans filed herewith. No change in use, egress or occupancy.
Plumbing modifications taking place on the 6th floor as per plans filed herewith. No change in use, egress or occupancy.
Construction of New Commercial High Rise Building. NYC Development HUB Consultation on 8.11.2021. ENERGY MODELING SUBMITTED UNDER MECHANICAL SUBSEQUENT FILING M00615380-S5.
Sprinkler modifications taking place on the 6th floor as per plans filed herewith. No change in use, egress or occupancy.
Plumbing modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.
Renovations of apartment 9F at the 9th floor of an existing multiple dwelling building. No change in use, egress or occupancy.