Building Permits in ZIP 10018
Manhattan, NY — 304 permits filed recently
304 permits
Alteration type 2 application filed for installation split ac units. no change of use, egress or occupancy under this application.
Plumbing work on the 17th floor (Mamiye) as indicated on drawings.
Installation of sidewalk shed to protect pedestrian from the facade repairs on the street facing facade.
Temporary plywood storefront enclosure
Installation of a heavy sidewalk shed to include storage.
Installation of a pipe scaffold.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Facade repairs as per plans filed. no change in use or egress under this application.
Exterior facade repairs which include demo and properly dispose of existing marble veneer, remove, patch, waterproof and install new veneer as per plans filed herewith. no change in egress, use or occ...
General construction to floor 1 as per plans filed herewith. No change in use, egress, or occupancy.
Proposed installation of gas fueled emergency generator filed in conjunction with NB # M00643592-I1.
Propose to install new condenser and air handlers. No change to use, egress or occupancy.
General construction on the roof as plans filed herewith. no change in use,egress or occupancy.
Renovation of apt 4e filed in conjunction with dob now pl. no change to use, occupancy or egress.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Structural work on the roof and 12th fl as plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Modifications to the existing HVAC System on the 10th Floor as per plans (Hines - ADA Restrooms.) No change to use, egress or occupancy.