Building Permits in ZIP 10003
Manhattan, NY — 475 permits filed recently
475 permits
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Facade Inspection via Industrial Rope Access
Modification of plumbing system as shown on plans.
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
rear wall restoration with lintel and sill replacement. removal of fire escape remnants in masonry
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Facade Inspection. Designated Primary Site supervisor: Jesus Decola
Heat Pump Installation; includes removal and replacement of existing condensers and air handlers. Installation of New Steel Dunnage at the Roof to accommodate new, smaller condensers. No change in use...
Structural scope only associated with the renovation of the 005 FL at the New School including dunnage on a roof. No change of use, egress or occupancy.
Renovation of existing eating and drinking establishment at first floor. Work include install new mechanical units with dunnage at roof. No change in use, egress or certificate of occupancy.
Prop. plumbing work associated with renovation of primary bathroom at first floor of exist. two story plus cellar condominium unit# 5 as indicated on plans. no changes to exist. use, occupancy, or egr...
Modification to exisiting sprinkler system,no change to use, egress, or occupancy.
Application file to exterior facade repair as brick replacement, brick crack repair and brick pointing at front elevation. remove dob violation#cpi10304hz. no change in use, egress or occupancy under...
Installation of supported scaffolding for facade repairs.
New and relocating existing sprinkler system
Demo 1 bathroom, kitchen cabinets, walls at noted locations, new flooring, ceiling, new walls at noted locations. apt being changed from a 2 to 3 bedroom. no change in use, occupancy or means of egres...
New plumbing installation for commercial kitchen and 3 toilets at new restaurant
Hereby filing for the renovation of unit #5a. no change in use, egress or occupancy.
Interior Renovation of existing apartment associated with the General Construction scope. No change in use, egress, or occupancy under this application.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.