Building Permits in ZIP 10023
Manhattan, NY — 1,034 permits filed recently
1,034 permits
General Construction at 4th floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
Filing herewith for 21' curb cut at West 62nd Street as per plans. Filed in conjunction with Alt-CO #M01270545. No change in use, occupancy, or egress under this application.
Emergency Roof Repair Project as per plans. No change to use, egress, or occupancy.
Installation of pipe scaffold as per plans. no change in use, egress or occupancy.
Filing herewith for 28.5' curb cut on West 62nd Street as per plans. Filed in conjunction with Alt-CO #M01270545. No change in use, occupancy, or egress under this application.
Installation of pylwood fence as per plans. plywood fence shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
Amsterdam Houses Bldg 01, Repair of spalled concrete at interior spandrel beams at 13th Floor apartments 13B & 13D as per the plans filed.
9th Cycle FISP repairs. No change to use, egress or occupancy.
Amsterdam Houses Bldg 06, Repair of spalled concrete at interior spandrel beams at 6th Floor apartments 6A, 6B, 6C, 6D & 6E as per the plans filed.
Installation of pylwood fence as per plans. plywood fence shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
Plumbing work on the 2nd floor in unit 203 as per plans filed herewith. work includes removal and installation of new bathroom fixtures. no change in use, egress, or occupancy.
Amsterdam Houses Bldg 07, Repair of spalled concrete at interior spandrel beams at 6th Floor apartments 6B & 6C as per the plans filed.
Boiler replacement as a subsequent in conjunction with M00674188- I1 BE to add the 2nd boiler information .NO change in Use,Occupancy or Egress .
. installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy installation of temporary custom color sidewalk shed at central park west and west 61st st el...
Filing herewith civil scope for non-structural demolition aka removal scope of planters, benches, trees, etc. at garage roof - plaza level (Damrosch Park) as per plans. No change in use, occupancy, or...
Modifications of existing steel beams in apartments 12-40 & 12-41 (approximately 30 s.f.).
Install new 4 level supported scaffolding to allow the repair of the existing chimney liners as per plans, no change in use occupancy or egress
General construction related to the renovation of an existing retail space (chocolate store) in the cellar and first floor. No change to use, egress, or occupancy.
Filing gc for new partition and replacement of appliances and fixtures. scope of work is limited to unit 25d and there is no change in egress, use, or occupancy.
Plumbing work related to the interior renovation of apt. 8c on the 8th floor. no change to use, egress, or occupancy.