Building Permits in ZIP 10022
Manhattan, NY — 1,619 permits filed recently
1,619 permits
Modification to existing plumbing system as per drawings filed herewith. no change to use, occupancy, or egress
At 28th floor tenant space, modification to existing sprinkler system as per plans filed herewith. no change to occupancy or means of egress.
Installation and modification of plumbing fixtures on floors 028 and 029. Plumbing work. There is to be no change of use, occupancy, or egress.
Sprinkler head changes as indicated on plans.
Mechanical modificationst taking place on the 12th floor as per drawings filed herewith. no change in use, egress or occupancy.
Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes, Pantry, ADA Restroom and Renovate Existing Men's & Women's Restrooms on 32nd Floor. No Change to Occupancy, Use o...
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 14th floor (marketing floor) / 6th floor (construction floor) as per plans filed herewith. no chang...
General construction modifications taking place on the 12th floor as per drawings filed herewith. no change in use, egress or occupancy.
Modification to existing plumbing system as per drawings filed herewith. no change to use, occupancy, or egress
Interior removal fit out for Bank of America.
Support of excavation for the construction of a new building as per plans filed herewith.
General construction modifications on the 19c/20m floor as per plans filed herewith. no change of use, egress or occupancy.
Interior renovation in apt 20mn filed in conjunction with dob now pl. no change to use, occupancy or egress.
Installation of construction fence for new building construction as per plans. no change in use occupancy or egress under this application. construction fence shall comply with chapter 33 of the 2022...
General construction from the 32nd floor to the 34th floor as plans filed herewith. no change in use, egress, or occupancy.
General Construction modifications to take place on the Facade as per drawings filed herewith. No change in use, egress, or occupancy.
Interior alterations to apt #8 (3rd floor). Replace kitchen cabinets, wall and floor finishes and bathroom wall waterproofing. No change to use, egress or occupancy.
Foundation work for the construction of a new building as per plans filed herewith.
Application filed herewith for interior removals on the 16th floor of a 22 story building. no change in occupancy use or egress under this application
Interior demo & reno of non-load bearing partitions, walls, doors, frames, ceiling &n finishes as indicated on plans.