Window replacement work a shown. glass removal and operable window installation. limitedmasonry removal at the sills.
Minor interior partition changes as per plans. no change to use, egress or occupancy filed under this application.
Miscellaneous facade restoration and structural modificationas as per plans. no change in use, egress or occupancy.
Plumbing modifications on 3rd floor related to office renovations
IRA Rope Access Facade Inspection
Structural work as shown on plans filed herewith. No change in use, egress or occupancy.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at east 60th street and 5th avenue elevations.
general construction work as per plans filed herewith. No change in use, egress or occupancy.
Modification of existing sprinkler system as per drawings filed herewith. no change to use, occupancy, or egress
Underground plumbing with plans filed herewith in conjunction to the NB (M00505081)
Installation and modification of plumbing fixtures on floors 028 and 029. Plumbing work. There is to be no change of use, occupancy, or egress.
At 28th floor tenant space, modification to existing sprinkler system as per plans filed herewith. no change to occupancy or means of egress.
General construction modifications on the 19c/20m floor as per plans filed herewith. no change of use, egress or occupancy.
Interior renovation in apt 20mn filed in conjunction with dob now pl. no change to use, occupancy or egress.
General construction modifications taking place on the 12th floor as per drawings filed herewith. no change in use, egress or occupancy.
Mechanical modificationst taking place on the 12th floor as per drawings filed herewith. no change in use, egress or occupancy.
Support of excavation for the construction of a new building as per plans filed herewith.
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 14th floor (marketing floor) / 6th floor (construction floor) as per plans filed herewith. no chang...
Interior removal fit out for Bank of America.
Sprinkler head changes as indicated on plans.