Renovation
$450,000
Unity Construction Group
Kevin C.
New York County
Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes, Pantry, ADA Restroom and Renovate Existing Men's & Women's Restrooms on 32nd Floor. No Change to Occupancy, Use or Egress is Proposed
5 other permits at 950 3 Avenue. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Install Pantry Plumbing Fixtures, Appliances, Elec. Water Heater, Mother's Rm Sink, Drinking Fountain, ADA Restroom & Assoc Piping, Replace Men's & Women's Restroom Plumbing Fixtures & Piping Back to...
Install Pantry Plumbing Fixtures, Appliances, Elec. Water Heater, Mother's Rm Sink, Drinking Fountain, ADA Restroom & Assoc Piping, Replace Men's & Women's Restroom Plumbing Fixtures & Piping Back to...
Installation of heavy duty sidewalk shed with material storage (300 psf and 600 psf) during facade repair. no change in egress, use, or occupancy. shed to comply with 2014 nyc building code.
Facade repairs as per plans submitted herewith. there is no change in use, egress or occupancy.