Roofing Permit — 950 3 AVENUE
Roofing
$115,000
Unity Construction Group
Kevin Camilleri
New York County
Work Description
Install Air Conditioning & Transfer Air Ducts & Grilles, Volume Dampers, Supply Air Diffusers, Return Air Grilles, Exhaust Fans & Ducts & Replace Insulation on Existing H.P. Duct on 32nd Floor, Replace Roof-Top A/C Unit, Curb & Associated Ducts on Roof
Other permits at this address
5 other permits at 950 3 AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes, Pantry, ADA Restroom and Renovate Existing Men's & Women's Restrooms on 32nd Floor. No Change to Occupancy, Use o...
Install Pantry Plumbing Fixtures, Appliances, Elec. Water Heater, Mother's Rm Sink, Drinking Fountain, ADA Restroom & Assoc Piping, Replace Men's & Women's Restroom Plumbing Fixtures & Piping Back to...
Install Pantry Plumbing Fixtures, Appliances, Elec. Water Heater, Mother's Rm Sink, Drinking Fountain, ADA Restroom & Assoc Piping, Replace Men's & Women's Restroom Plumbing Fixtures & Piping Back to...
Install Pantry Plumbing Fixtures, Appliances, Elec. Water Heater, Mother's Rm Sink, Drinking Fountain, ADA Restroom & Assoc Piping, Replace Men's & Women's Restroom Plumbing Fixtures & Piping Back to...
Install Air Conditioning & Transfer Air Ducts & Grilles, Volume Dampers, Supply Air Diffusers, Return Air Grilles, Exhaust Fans & Ducts & Replace Insulation on Existing H.P. Duct on 32nd Floor, Replac...
More Roofing permits in Manhattan
Facade repairs including the replacement of roof pavers as indicated on the plans filed herewith. no change in use, egress or occupancy.
Modification of mechanical systems on parts of Sub Cellar, Cellar, mezzanine, 23, 24, 51, 52 and Roof as indicated on attached plans. There is no change in occupancy, use or egress.
Interior removal of walls, doors, floor finishes, and ceilings on all floors; removal of windows and non-structural masonry wall infill; roof waterproof membrane assembly to the existing roof slab; an...
Installation of existing deployable stage roof, temporary performance platform, bleachers, decking, tenting. No alteration to existing structures for Summer Stage Concerts. A TPA permit is required.
Installation of temporary roof protection as per plan. no change in use, egress or occupancy.