Building Permits in ZIP 10021
Manhattan, NY — 781 permits filed recently
781 permits
Structural repairs and replacement as per plans, no change to use, egress or occupancy. full scope of work description in comments section.
Subsequent MS application for installation of HVAC units and associated mechanical equipment as per plans submitted.
Structural repairs and replacement as per plans, no change to use, egress or occupancy. full scope of work description in comments section.
Filing for interior and exterior renovation of single family townhouse . Work includes reallocation of floor area, facades, and new elevator bulkhead. Structural work filed separately. No change to us...
Installation of Concrete pump as per plans filed herewith. No change in use, egress or occupancy.
Perform temporary structural shoring at basement floor,install lowered basement floor framing, extend building vertically @ rear starting at 1st floor up to roof.
Application to renovate an existing apt. tasks will include replacing all kitchen appliances and bathroom fixtures. waterproofing all wet area and new wood floor as indicated in drawing. no change to...
5B: Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy
Installation of a temporarily needle beam and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applica...
Interior renovation of an existing multi-use building. General Construction and Structural work proposed as per plans. There will be no change to use, occupancy or egress.
MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH ON THE 6TH FLOOR IN APARTMENT 6A. NO CHANGE TO USE EGRESS OR OCCUPANCY. Replacement of the PTAC units.
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Bathrooms, closets, kitchen renovation in apt. #2a. no change of use, egress or occupancy.
Modification of an existing sprinkler system from the bsmt ramp up to the 3rd floor ramp of the nyp garage as per plans submitted herewith, no change in use, egress or occupancy group.
interior renovation in apt 10A
Conversion of a mixed-use building to a single-family home. Removal and erection of interior partitions, replace and install new windows, new enlargement at 5th floor rear and new elevator bulkhead. A...
Installation of a temporarily supported scaffold and material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appli...
New plumbing work apt #2a in conjunction with m01122027
MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH ON THE 6TH FLOOR IN APARTMENT 6A. NO CHANGE TO USE EGRESS OR OCCUPANCY. Replacement of the PTAC units.
Conversion of a mixed-use building to a single-family home. Removal and erection of interior partitions, replace and install new windows, new enlargement at 5th floor rear and new elevator bulkhead. A...