Building Permits in ZIP 10021
Manhattan, NY — 781 permits filed recently
781 permits
New plumbing work apt #2a in conjunction with m01122027
Bathrooms, closets, kitchen renovation in apt. #2a. no change of use, egress or occupancy.
Installation of a temporarily supported scaffold and material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appli...
Interior renovation of an existing multi-use building. General Construction and Structural work proposed as per plans. There will be no change to use, occupancy or egress.
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
interior renovation in apt 10A
Installation of a temporarily needle beam and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applica...
Post approval amendment filed to reflect minor interior revisions including addition of non-load bearing partitions for closets, revised location of washer/dryer, and proposed soffit at bedroom . no c...
Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
4B: Interior renovations as per plans filed herewith. No change to use, egress or occupancy
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Interior renovation of existing apartment unit as per plan submitted herewith. No change in use, egress, or occupancy under this application
installation of suspended scaffold for facade work.
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
partial interior renovation existing apartment on 9th floor. No change to use, occupancy or egress. Conversion of existing kitchen to wet bar area: relocation of sink, dishwasher, refrigerator. Remova...
Installation of temporary window protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Sp work filed in conjunction with dob now mh. no change to use, occupancy or egress.
Interior renovation to Install New AC system with ductwork, Components , piping etc, bath exhaust and controls. Minor Exterior work to include New thru-the -wall condensing units. No change to egress,...
Interior renovation to Install New AC system with ductwork, Components , piping etc, bath exhaust and controls. Minor Exterior work to include New thru-the -wall condensing units. No change to egress,...
Sp work filed in conjunction with dob now mh. no change to use, occupancy or egress.