Building Permits in ZIP 10021
Manhattan, NY — 775 permits filed recently
775 permits
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Removal of all existing sprinkler heads and piping and installation of new full building coverage sprinkler system designed to nfpa 13 requirements. no change of use, occupancy or egress.
Application hereby filed for temporary construction fence during construction operations in conjunction with GC application no. M01250485-I1
In unit 17a, new non-loadbearing glass partitions as shown on plans. no proposed plumbingwork. no change to egress, use, or occupancy.
Provide temporary core protection sprinkler system to protect jobsite while under construction. No change to use, occupancy or egress under this application.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Plumbing work installation of stacked washer and electric dryer
plumbing work in apt 10A
Plumbing Work Proposed for a Single-Family Home. No Change to Use, Occupancy or Egress.
Plumbing Work Proposed for a Single-Family Home. No Change to Use, Occupancy or Egress.
In unit 17a, new non-loadbearing glass partitions as shown on plans. no proposed plumbingwork. no change to egress, use, or occupancy.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Provide temporary core protection sprinkler system to protect jobsite while under construction. No change to use, occupancy or egress under this application.
Installation of Concrete pump as per plans filed herewith. No change in use, egress or occupancy.
Interior alterations of existing commercial space. no change to use, occupancy or egress
5B: Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy
Application to renovate an existing apt. tasks will include replacing all kitchen appliances and bathroom fixtures. waterproofing all wet area and new wood floor as indicated in drawing. no change to...
Subsequent MS application for installation of HVAC units and associated mechanical equipment as per plans submitted.
Perform temporary structural shoring at basement floor,install lowered basement floor framing, extend building vertically @ rear starting at 1st floor up to roof.
Filing for interior and exterior renovation of single family townhouse . Work includes reallocation of floor area, facades, and new elevator bulkhead. Structural work filed separately. No change to us...