HVAC Permits in Manhattan, New York
1,059 hvac permits filed recently
1,059 permits
Replace indirect domestic water heaters and gas connection to replacement boilers.
Modifications of the existing HVAC system and associated ducts & piping on the 45th Floor, as per plans. No change to use, egress, or occupancy.
Gas connection to three (3) replacement gas boilers.
Modifications of the existing HVAC system and associated ducts & piping on the 46th Floor, as per plans. No change to use, egress, or occupancy.
Interior modifications in suite 1510 (liminal) on the 15th floor. includes removal of select existing ductwork and mechanical components, installation of new hvac distribution and air devices.
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
Replace three boilers.
Herewith filing boiler work as per plans. no change in use, egress or occupancy
Modifications of the existing HVAC system and associated ducts & piping on the 47th Floor, as per plans. No change to use, egress, or occupancy.
Duct work for existing hvac system for medical office on 7th fl as per plans filed herewith. no change to use, egress or occupancy.
Interior fit-out of existing residential(floor 1) unit 1g proposed. remove and install non-bearing partitions, install mini-split air conditioning unit. no change of use and occupancy under this appli...
Replace two boilers.
Interior fit-out of existing residential(floor 1) unit 1g proposed. remove and install non-bearing partitions, install mini-split air conditioning unit. no change of use and occupancy under this appli...
Replace three boilers.
Herewith filing boiler work as per plans. no change in use, egress or occupancy
Modifications of the existing HVAC system and associated ducts & piping on the 46th Floor, as per plans. No change to use, egress, or occupancy.
Replace two boilers.
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
Gas connection to three (3) replacement gas boilers.
Modifications of the existing HVAC system and associated ducts & piping on the 45th Floor, as per plans. No change to use, egress, or occupancy.