HVAC Permits in Bronx, New York
41 hvac permits filed recently
41 permits
Replace boiler and hot water heater and install two new boilers and one new hot water heater. no change in use, egress or occupancy.
Lobby renovation, new hvac system integration, and front steps& portico repair and restoration. related ms, pl, and st filed separately. no change in use, egress, or occupancy.
Installation of variable refrigerant flow (vrf) hvac system serving apt 11-ef including minor partition work, new dropped ceilings and soffits to accomodate new lighting.
This application is filed for the installation of one (1) gas boiler in cellar
Installation of one (1) new gas boiler in cellar
Replace oil burner on exisitng boiler.
Install new hvac as plan. no change in egress, use, or occupancy.
Installation of 36,000 BTU single zone HVAC system in LAN room. No change to occupancy, use or egress.
Replacement of air conditioning unit for the lobby area. No change in use egress and occupancy.
Ps 886x, installation of temporary boiler breeching and stack, steam, condensate, and make-up water piping submitting on behalf of the contractor in conjunction with dob # x01130125. no change in use,...
Installation of plumbing fixtures at first and second floor-installation of (2) combi boilers and new bathroom at cellar.
Replace boiler and gas/oil burner.
Modifications to existing HVAC systems. No change in use egress or occupancy.
FOR RESIDENTIAL TENANT: INSTALL NEW COMBI-BOILER IN 2nd FLOOR APARTMENT
FOR RESIDENTIAL TENANT: INSTALL NEW COMBI-BOILER IN 2nd FLOOR APARTMENT, REMOVE BOILER AND WATER HEATER IN CELLAR, INSTALL ONE (1) NEW GAS METER AND INSTALL GAS PIPING.
Mechanical work-type only to legalize existing hvac units.
Install replacement boiler/burner unit as per plans. filing in conjunction with x01361259-i1-la. no change to use, occupancy or egress.
Installation of one (1) new gas boiler in conjunction with alteration application# x00913158-i1
HVAC work being filed in conjunction with Alt CO. No change to use, egress or occupancy.
Relocate two (2) existing 275- gallon fuel oil storage tanks. install new oil-fired hot water heater as per plans. no change in use, egress or occupancy.