HVAC Permits in Brooklyn, New York
167 hvac permits filed recently
167 permits
Replacement of brick masonry, replacement of steel lintels, replacement of 3-wythe parapets, replacement of thru wall air conditioner sleeves, and replacement of coping stone. No scope of work at the...
Install new h.w.h., boiler, bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 3-pc bathroom, boilers and hot water heaters in cellar; new yard drain at rear yard. no...
CAP & remove gas piping from rear cottage and replace gas stove with electric stove. Cap & Remove Residential gas stove & kitchen sink in basement kitchen, remove existing gas boiler & hwh, filing to...
Interior renovation of cellar basement and 1st floor of existing 2 story building. demolition and construction work as per plan. install new hvac, partition, flooring, ceiling and painting throughout....
Install new boiler exhaust vent per plans.
Subsequent filing for kitchen hood and HVAC system modification in an existing retail space (Suite C06) as per the plans filed herewith. No change in use, egress or occupancy.
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
To file MS work type to Install new HVAC for unit H1R. No change in use, egress or occupancy under this application.
Remove existing fuel oil storage tanks as per plans. no change in use, egress or occupancy.
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
install non bearing partitions to create storage room, enclose boiler and hot water heater room and create bathroom with w.c. and lav only. no change in use, egress or occupancy. plumbing to be filed...
Abandon existing fuel oil storage tank as per plans. no change in use, egress or occupancy.
Interior mechanical demo & modification to existing HVAC units for existing community facility building. No change in use, egress or occupancy.
Install new central air condition system at existing 1-story building.
Subsequent filing plumbing work to install kitchen, bathroom, & boiler room. no change in use, egress, or occupancy.
Ex. VRF multi-split heat recovery system to be used for air conditioning dining, service and prep area. Ex. ceiling exhaust fans for restroom to remain. Ex. ERV to be reused for outside air requiremen...
General renovation of 3-family house with replace/relocated/new plumbing fixtures and boiler and h.w.h as per plan. no change in use, egress or occupancy.