Other Permits in Brooklyn, New York
1,426 other permits filed recently
1,426 permits
File to install new AC units conjunction GC B01365701-P1, no change in use, egress or occupancy.
Mechanical work associated with application#b01359339
Installation of new curb cuts as per plans
Installation of a temporary supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with th...
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Extension of elevated deck at rear (exterior patio)
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no changes in use, egress or occupancy in this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
refurbish apartment#3L; replace gypsum board; relocate minor partitions, cabinet work, replace tiles, replace floors,doors, paint
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Construction fence plan filed in conjunction with Alt-co job #B00663750-I1.
Installation of suspended scaffold for facade work or inspection.
Removal of one story quonset hut as per plans.
Modification to Verizon site. Relocate 2 GPS antennas and 1 antenna. Replace 1 antenna, remove 1 antenna, replace 2 RRHs, remove 2 RRHs, install 4 RRHs, install 6 antennas, remove 1 cabinet, install n...
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Propose horizontal extension of existing 1 family residential as per plan. No change in use. egress or occupancy under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Radon mitigation system and associated piping and exhaust fans. No change to use or egress.
Temp. construction fence