HVAC Permits in Manhattan, New York
1,069 hvac permits filed recently
1,069 permits
Herewith filing general construction modifications for Boiler Replacement project. No change in use, egress, or occupancy.
Mechanical: Modifications to the existing HVAC system on the 16th Floors- (Orrick) as per plans. No change to use, egress or occupancy.
Install new gas boiler
Herewith filing general construction modifications for Boiler Replacement project. No change in use, egress, or occupancy.
Mechanical: Modifications to the existing HVAC system on the 16th Floors- (Orrick) as per plans. No change to use, egress or occupancy.
Replace existing three domestic hot water boilers and storage tanks with three domestic hot water heaters and five domestic hot water storage tanks. connect to existing gas piping. no change in use, e...
Modifications to existing HVAC system as per plans filed herewith. No change to use, egress or occupancy under this application.
Hvac work for lobby renovation as per the plans filed herewith. no change to use, egress or occupancy.
Legalize 2 low pressure boilers serving the 1st floor commercial space and the 1st floor residential apt. cap + remove boiler lpb-1 and remove from the required boiler inspection log. no change to use...
INSTALL REPLACEMENT 2,500-GALLON FUEL OIL STORAGE TANK IN CELLAR AS PER PLANS. REMOVE EXISTING 4,000-GALLON FUEL OIL STORAGE TANK. FILED IN CONJUNCTION WITH LAA APPLICATION No. M01312797-I1-LA.NO CHAN...
Modification/addition to existing HVAC ductwork and related piping as shown on drawings. No change in use, egress or occupancy.
Replacement of two (2) existing low pressure natural gas hot water boilers within existing cellar mechanical room. no change in use, egress or occupancy.
1. repair boiler room floor and provide new finish flooring. repoint interior masonry wall. patch plaster at ceiling. 2.patch and repair exist. plaster ceiling on first floor. 3. remove window pane at...
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
INSTALL REPLACEMENT 2,500-GALLON FUEL OIL STORAGE TANK IN CELLAR AS PER PLANS. REMOVE EXISTING 4,000-GALLON FUEL OIL STORAGE TANK. FILED IN CONJUNCTION WITH LAA APPLICATION No. M01312797-I1-LA.NO CHAN...
Hvac work for lobby renovation as per the plans filed herewith. no change to use, egress or occupancy.
Modification/addition to existing HVAC ductwork and related piping as shown on drawings. No change in use, egress or occupancy.
Legalize 2 low pressure boilers serving the 1st floor commercial space and the 1st floor residential apt. cap + remove boiler lpb-1 and remove from the required boiler inspection log. no change to use...
Replacement (1) new low pressure boiler. replacement (1) new combination gas/oil burners. change grade of fuel oil from #4 oil to #2 oil. no change in means of egress use group or occupancy.