HVAC Permits in Manhattan, New York
1,069 hvac permits filed recently
1,069 permits
Plumbing work associated with Boiler replacement as per plans filed herewith. No change in use, egress or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
3 new gas boilers in conjunction with nb m00798756-i1
Proposing Installation of (2) 10 ton indoor air systems, ductwork, and associated apparatus, remote Condensing Units for refrigeration & ice mach.,,, Pollution control exhaust unit, Exhaust Fans , Gas...
3 new gas boilers in conjunction with nb m00798756-i1
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
2 new gas boilers and decommissioning of 1 ex. oil boiler , no change to use egress or occupancy
Plumbing work associated with Boiler replacement as per plans filed herewith. No change in use, egress or occupancy.
Installation of 2 ton air conditioning unit on the 7th Floor. No change in use egress and occupancy.
Plumbing work related to boiler replacement. no change in use, egress, or occupancy.
Proposed interior renovation for a nail spa and installation of nail ventilation system and air conditioner system in unit#601,#603 on the sixth floor as per plan. no change in use, egress oroccupancy...
Modification to HVAC system as per plans filed herewith.
Proposing Installation of (2) 10 ton indoor air systems, ductwork, and associated apparatus, remote Condensing Units for refrigeration & ice mach.,,, Pollution control exhaust unit, Exhaust Fans , Gas...
Install split system air conditioning units.
Application file to exist. chimney remove and replace new double wall stainlesssteel exterior chimney from basement-boiler room to be extended 4 feet above parapet wall as per plan. hpd omo#no change...
Installation of one (1) new gas boiler. all work as per plans filed herewith. no change in use, egress, or occupancy.
Modifications to the existing HVAC System and relocation of ductwork on the 7th Floor as per plans (Hines - Demising Wall.) No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 31st - 33rd Floors, as per plans. No change to use, egress, or occupancy.
Modifications to existing HVAC system as per plans filed herewith. No change to use, egress or occupancy under this application.
Replace existing three domestic hot water boilers and storage tanks with three domestic hot water heaters and five domestic hot water storage tanks. connect to existing gas piping. no change in use, e...