New Construction Permits in Manhattan, New York
308 new construction permits filed recently
308 permits
Construction of 1 story new building for new pneumatic waste collection system for the polo grounds nycha campus in harlem. related applications to be filed as subsequent applications.
Structural scope for new building filed in conjunction with application M00951038-I1
North hoists-cars 1&2: equipment use: dual 7400# capacity personnel/material hoists during nb filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this...
North hoists-cars 1&2: equipment use: dual 7400# capacity personnel/material hoists during nb filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this...
Construction of 1 story new building for new pneumatic waste collection system for the polo grounds nycha campus in harlem. related applications to be filed as subsequent applications.
Structural scope for new building filed in conjunction with application M00951038-I1
Curb cut filed in conjunction with NB # 121188847.
Curb cut filed in conjunction with NB # 121188847.
Mechanical work in conjunction with NB M08022114-I1
Mechanical work in conjunction with NB M08022114-I1
General construction work for Interior fit out on 19th floor (23rd floor marketing). Filed in conjunction with HUB Development NB Job # 121206550 reviewed under 2014 code..
Proposed installation of gas fueled emergency generator filed in conjunction with NB # M00643592-I1.
Support of Excavation for new building filed under M00950138
Mechanical work in conjunction with New Building M00688136-I1
Mechanical work in conjunction with New Building M00688136-I1
General construction work for Interior fit out on 19th floor (23rd floor marketing). Filed in conjunction with HUB Development NB Job # 121206550 reviewed under 2014 code..
Support of Excavation for new building filed under M00950138
Proposed installation of gas fueled emergency generator filed in conjunction with NB # M00643592-I1.
Temporary structure for an WNBA event at HY Plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
Structural work for one story maintenance and operation pre-fabricated 968 sf new building in east river park.