HVAC Permits in Manhattan, New York
1,059 hvac permits filed recently
1,059 permits
NYCHA Lehman Village House Building#4 Sidewalk shed installation for temporary boiler connection to exiting building #4 and new liner installation in exiting building #4. No change in use, egress, or...
Install replacement 3,500-gallon fuel oil storage tank as per plans. no change in use, egress or occupancy.
Replacement of existing gas water heaters and relocation of existing boilers within existing 3-story residential building due to fire damage. no change or use, egress, or occupancy under this applicat...
Minor Modifications to the Existing Air Conditioning Ductwork, Installation of Volume Dampers, Supply Air Registers, Return Air Grilles & Return Air Openings in Walls on Part of the 11th Floor
Application filed for boiler installation in the cellar as per plans filed herewith. this application will supersede application # 100485379
Replace indirect domestic water heaters and gas connection to replacement boilers.
Replace existing indoor and outdoor central HVAC system with a new indoor and outdoor split ductless HVAC system, including all associated controls and refrigerant tubing. No change to use, egress or...
Propose mechanical modifications at 001 floor existing retail space. To install HVAC system all as per plans herewith filed. No change in egress use or occupancy filed under this application.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Installation of one (1) three ton mini-split air conditioning system and associated fan coilunits in apartment 9b. no change to use, egress or occupancy under this application
installation of HVAC systems for partial cellar and 1st floor store.
Installation of new boiler for fourth floor Mezzanine.
Air conditioning unit replacement on the 7th floor Data Center. No change in use egress and occupancy.
Installation of new boiler for fourth floor Mezzanine.
Replace existing indoor and outdoor central HVAC system with a new indoor and outdoor split ductless HVAC system, including all associated controls and refrigerant tubing. No change to use, egress or...
Application filed for boiler installation in the cellar as per plans filed herewith. this application will supersede application # 100485379
installation of HVAC systems for partial cellar and 1st floor store.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Minor Modifications to the Existing Air Conditioning Ductwork, Installation of Volume Dampers, Supply Air Registers, Return Air Grilles & Return Air Openings in Walls on Part of the 11th Floor