NYCHA DYCKMAN BOILERS:Building 6: Plumbing work in relation to boiler replacement as per plans filed herewith.
Proposed air conditioning system and ducwork
Modifications to the existing HVAC system on the 14th, 18th, 19th and 20th floors as per plans. No change to use, egress or occupancy.
Ps 143m, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler and provide heat to the building. no change in use, egress, or occupancy.
Lehman village boiler upgrade, structural modifications as per plans. no change in use egress or occupancy.
Modifications to the existing HVAC system on the Cellar & 3rd floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Dyckman houses, installation of temporary boiler stacks, steam, condensate, make-up water piping connected to existing heating plant to provide heat during the heating season in conjunction with dob #...
Filing herewith HVAC system as per plans filed herewith.
modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Spear - modification of hvac.
HVAC removals (Early Demo- Package 1) as per plans. No change to use, egress or occupancy.
Nycha dyckman houses, installation of temporary gas piping to connect (3) temporary mobile boiler trailers to provide heat during the heating season. no change in use, egress, or occupancy.
NYCHA Boilers: Dyckman: Building 6: General Construction in relation to boiler replacement as per plans filed herewith. No change to use, egress or occupancy.
NYCHA Boilers Dyckman: Building8; General Construction associated with boiler replacement as per plans filed herewith.
The scope of work is to file the operation of AC-1 as the heating and air conditioning unit for the residence.(this will allow CON-ED to reconnect the gas to allow the unit to heat, since it was disco...
Installation of new gas boiler in cellar apt 1E as per plans filed herewith. No change in use, egress and occupancy.
NYCHA Boiler Dyckman: Building 8 Mechanical work in association with boiler replacement as per plans filed herewith.
Hvac duct modifications for 8th and 12th floor commercial spaces as per plans filed herewith.
Modifications & replacement to existing hvac system throughout building. no change in use, egress, or occupancy.
Scope of work will include Remove unused fuel oil and existing fuel oil tank and remove 2 existing steam boilers & burner''s .installation of New low pressure steam Boilers, and dual fuel burners , In...