HVAC Permits in Manhattan, New York
1,059 hvac permits filed recently
1,059 permits
Facade renovation modification associated with hvac scope and window replacement. no change to use, egress nor occupancy.
Work to commercial space at the 1st floor of a 5 story, multiple dwelling building. alterations to include interior partition work and the installation of a new hvac system. no change to zoning, use,...
Spear - modification of hvac.
HVAC removals (Early Demo- Package 1) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 14th, 18th, 19th and 20th floors as per plans. No change to use, egress or occupancy.
NYCHA BOILER -Dyckman: Building 8 Boiler replacement as per plans filed herewith,
Installation of new boiler in existing mechanical room. removing old boiler not in use. no change of use egress or occupancy.
modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Lehman village boiler upgrade, structural modifications as per plans. no change in use egress or occupancy.
Dyckman houses, installation of temporary boiler stacks, steam, condensate, make-up water piping connected to existing heating plant to provide heat during the heating season in conjunction with dob #...
Proposed air conditioning system and ducwork
NYCHA BOILERS Dyckman: Building 5: Site/Civil work in relation to boiler replacement as per plans filed herewith
NYCHA BOILER -Dyckman. BUILDING 5: PLUMBING WORK IN RELATION TO BOILER REPLACEMENT AS PER PLANS FILED HEREWITH
Ps 143m, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler and provide heat to the building. no change in use, egress, or occupancy.
Modifications to the existing HVAC system on the Cellar & 3rd floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
NYCHA BOILER -Dyckman: Building 5.Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues and Boilers
Filing herewith HVAC system as per plans filed herewith.
NYCHA Boilers Dyckman: Building 3: Site/Civil work as per plans filed herewith. No change to use, egress or occupancy.
NYCHA Boilers: Dyckman Building 5: Mechanical work associated with Boiler replacement as per plans filed herewith.
Nycha dyckman houses, installation of temporary gas piping to connect (3) temporary mobile boiler trailers to provide heat during the heating season. no change in use, egress, or occupancy.