1,059 hvac permits filed recently
1,059 permits
Cap and remove existing boiler. install and replace plumbing fixtures on basement, 1st, 2nd, and attic for an existing one family house.
Modifications to the existing HVAC System: Install new ductwork, chilled water system, associated insulation, VAVs, (2) CRAH units, (1) Chilled Water FCUs, Condensate Pump/Drain Pans on the 17-18th Fl...
Removal of existing high pressure steam service and installation of three (3) new boiler, burner, breeching, fan, and associated piping / wiring / controls. No change in use, egress or occupancy.
Existing heating and hot water boiler plant to be removed and replaced with new combined heating plant, all existing piping, valves, heat exchangers, tanks pumps to be removed. Al new hydronic equipme...
NYCHA BOILER_BLDG#11_Remove steam hot water storage tank and replace with new steam instantaneous water heater. Provide condensate piping from mechanical provided condensate pump to exist. bldg. drain...
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Install new ductwork and diffusers per new layout. install new vav box and control. connect new ductwork to existing building hvac system. install new exhaust fan and ductwork at existing tenant space...
General construction for removal of existing boiler flue in courtyard, as shown on plans filed herewith. No change to use, egress, or occupancy.
Provide duct layout changes to the existing HVAC system in conjunction with Alt #M01349048 as per plans filed no change in use occupancy or egress
Replacement of one(1) existing dual-fuel boiler/burner with one(1) new dual-fuel boiler/burner, existing storage tank to remain, as per plans filed herewith. no change in use, egress or occupancy. see...
Installation of temporary gas piping to temporary boiler as per plans filed herewith.
HEREWITH FILING MECHANICAL APPLICATION FOR INSTALLATION OF HVAC EQUIPMENT AS PER PLANS SUBMITTED. In conjunction with the GC application #'s M01191101, M01191238. NO CHANGE IN USE, EGRESS OR OCCUPANCY...
Modify existing curtain wall and rear exterior wall of the hotel building for new HVAC unit installation in guestrooms from 2nd to 17th floor. No change to use, occupancy, egress.
Replacement of one(1) existing dual-fuel boiler/burner with one(1) new dual-fuel boiler/burner, existing storage tank to remain, as per plans filed herewith. no change in use, egress or occupancy. see...
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modify existing curtain wall and rear exterior wall of the hotel building for new HVAC unit installation in guestrooms from 2nd to 17th floor. No change to use, occupancy, egress.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
General construction for removal of existing boiler flue in courtyard, as shown on plans filed herewith. No change to use, egress, or occupancy.
Provide duct layout changes to the existing HVAC system in conjunction with Alt #M01349048 as per plans filed no change in use occupancy or egress