HVAC Permits in Manhattan, New York
1,059 hvac permits filed recently
1,059 permits
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
Scope of work includes installation of new HVAC systems per modifications for renovation of roughly 4,360 sq.ft. Lobby space. No change of use, egress, or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
Modifications to the existing HVAC system on the 1st floor (Property Management Office) as per plans. No change to use, egress or occupancy.
Modifications and minor interior demolition of the existing HVAC system, including removals of ducts and piping on Floors 9, 34, 35, 37, as per plans. No change to use, egress, or occupancy.
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
Scope of work includes installation of new HVAC systems per modifications for renovation of roughly 4,044 sq.ft. Lobby space. No change of use, egress, or occupancy.
Scope of work includes installation of new HVAC systems per modifications for renovation of roughly 4.044 sq.ft. Lobby. No change of use, egress, or occupancy.
Scope of work includes installation of new HVAC systems per modifications for renovation of roughly 4,360 sq.ft. Lobby space. No change of use, egress, or occupancy.
New boiler installation, subsequent filing to add 2nd boiler, no change to use egress or occupancy, in conjunction to main job alt2 job number M00828324-I1. Landmark approval under main filing. LPC DO...
Hvac work as shown on plans submitted herewith. no change to use, egrees, or occupancy as of right.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
NYCHA BOILER-CARVER_BLDG #5_Remove and replace existing steam boiler plant with new boiler plant.
Cap and remove existing boiler. install and replace plumbing fixtures on basement, 1st, 2nd, and attic for an existing one family house.
Removal of existing high pressure steam service and installation of three (3) new boiler, burner, breeching, fan, and associated piping / wiring / controls. No change in use, egress or occupancy.
NYCHA BOILER-CARVER_BLDG #5_Remove exist steam-fired domestic hot water heat exchanger. Remove & replace sump pump. Install new gas HWHs, storage tank, floor drains and sanitary lines, gas piping. Pro...
Existing heating and hot water boiler plant to be removed and replaced with new combined heating plant, all existing piping, valves, heat exchangers, tanks pumps to be removed. Al new hydronic equipme...
Modifications to the existing HVAC System: Install new ductwork, chilled water system, associated insulation, VAVs, (2) CRAH units, (1) Chilled Water FCUs, Condensate Pump/Drain Pans on the 17-18th Fl...