HVAC Permits in Manhattan, New York
1,061 hvac permits filed recently
1,061 permits
Gas connection to replacement boilers.
New vrf air conditioning units within an existing building. new outdoor condensers in courtyard of building. no change in use or occupancy.
Modifications to the existing HVAC system on the Cellar, 1st - 5th floors (Nike - HOI) as per plans. No change to use, egress or occupancy
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
Install new gas piping and gas meter for replacement gas/oil burner on existing low pressure boiler. no change in use, egress or occupancy.
Herewith filing Fuel Oil Storage Removal in cellar. No change in use, egress, or occupancy.
New steel dunnage for new HVAC units.
Replace (2) gas fired boilers
New vrf air conditioning units within an existing building. new outdoor condensers in courtyard of building. no change in use or occupancy.
Boiler and burner replacement .
Install new gas piping and gas meter for replacement gas/oil burner on existing low pressure boiler. no change in use, egress or occupancy.
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
Gas connection to replacement boilers.
Modifications to the existing HVAC system on the Cellar, 1st - 5th floors (Nike - HOI) as per plans. No change to use, egress or occupancy
Oil to gas conversion for heat. Repair gas piping due to a gas shutdown. Install (1) gas water heater and (1) Steam boiler.
New steel dunnage for new HVAC units.
Herewith filing Fuel Oil Storage Removal in cellar. No change in use, egress, or occupancy.
Air conditioning unit replacement on the second floor MER. No change in use egress and occupancy.
Modifications to the existing HVAC System: Relocate ductwork and linear diffusers on the 25-26 and 28th Floors as per plans (DLA Piper Renovations.) No change to use, egress or occupancy.
Renovation the store#1 on 1st floor of existing 5 story building. install hvac and partition. construction work as per plan. no change in egress, use, or occupancy.