HVAC Permits in Manhattan, New York
1,061 hvac permits filed recently
1,061 permits
Modifications to the existing HVAC system on the the 28th and 35th floors as per plans. No changes to Use, Egress, or occupancy.
Hereby filing hvac system and related ductwork & piping per plans filed herewith. no change to use, egress or occupant
Application filed to install new mini split hvac units. all as per plans filed herewith.
Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 7th Floor and Reinstall ductwork on the 6th Floor in relation to slab infill as per plans (D...
Application filed to install new mini split hvac units. all as per plans filed herewith.
WCM INTERIOR 5th floor: HVAC DUCTWORK, PIPING AND EQUIPMENT MODIFICATIONS TO ACCOMMODATE THE NEW CLINIC SERVICES IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
Replacement of ductwork for existing HVAC units.
Installation of a day tank (330 gallons) used to feed both generators as per plans, plus 10,000-gallon tank which is used to feed the day tank on the 4th floor.
Boiler replacement in kind
Modifications to the existing HVAC system on the the 28th and 35th floors as per plans. No changes to Use, Egress, or occupancy.
Install HVAC unit for chase bank.
Existing gas piping connecton to replacement boiler.
NYCHA BOILER-CARVER_BLDG #5_Remove and replace existing steam boiler plant with new boiler plant.
modification & additions to existing 1st floor hvac systems and new cellar commercial cooling and hood exhaust systems as indicated on plans.
NYCHA BOILER-CARVER_BLDG #5_Remove exist steam-fired domestic hot water heat exchanger. Remove & replace sump pump. Install new gas HWHs, storage tank, floor drains and sanitary lines, gas piping. Pro...
Install HVAC unit for chase bank.
Existing gas piping connecton to replacement boiler.
New vrf air conditioning units within an existing building. new outdoor condensers in courtyard of building. no change in use or occupancy.
Install new gas piping and gas meter for replacement gas/oil burner on existing low pressure boiler. no change in use, egress or occupancy.