HVAC Permits in Manhattan, New York
1,061 hvac permits filed recently
1,061 permits
Air conditioning unit replacement on the second floor MER. No change in use egress and occupancy.
Nycha east river boilers consisting of plumbing work in the cellar and 1st floor as per plans filed herewith. no change to use, egress, or occupancy.
Addition/Modification to existing HVAC System as per plans filed herewith. No change in use, occupancy or egress.
Renovation the store#1 on 1st floor of existing 5 story building. install hvac and partition. construction work as per plan. no change in egress, use, or occupancy.
Abandon buried fuel oil tank and install two (2) 275 gallon fuel oil tanks.
Perform mechanical work inconjunction with existing ug6 eating & drinking establishment renovation. install split system hvac unit and bathroom ventilation. no change to use,egress, occupancy or fire...
Addition/Modification to existing HVAC System as per plans filed herewith. No change in use, occupancy or egress.
Renovation the store#1 on 1st floor of existing 5 story building. install hvac and partition. construction work as per plan. no change in egress, use, or occupancy.
Modifications to the existing HVAC System: Relocate ductwork and linear diffusers on the 25-26 and 28th Floors as per plans (DLA Piper Renovations.) No change to use, egress or occupancy.
Proposed installation of new perimeter terminal air conditioning and heating units (PTAC) at living room and bedrooms. No change in use, occupancy or egress under this application.
Air conditioning unit replacement on the second floor MER. No change in use egress and occupancy.
Replace gas burner on existing boiler as per plans filed in conjunction with laa m01342319. no change to use, occupancy or egress.
HVAC upgrade
Replacement (1) new gas fired hot water heater with integral burner in the sub-cellar. reconnect low pressure gas line, existing storage tanks. remove (1) boiler. no change in means of egress use grou...
Replacement (1) new gas fired hot water boiler. (hallways) no change in means of egress use group or occupancy.
Installation of new boilers
Installation of new boiler filed in conjunction with renovation of 5-story nycha multiple dwelling throughout. no change to use, egress or occupancy.
Removal of existing hvac system in existing rooms and new hvac design for new restrooms and rooms.
Existing heating and hot water boiler plant to be removed and replaced with new combined heating plant, all existing piping, valves, heat exchangers, tanks pumps to be removed. All new hydronic equipm...
Installation of electric hot water Boiler in conjunction with new 16-story Medical Office Building as per plans filed herewith.