Building Permits in ZIP 10128
Manhattan, NY — 762 permits filed recently
762 permits
Interior renovation to apartment 18C. Minor removal and construction of partitions and replace finishes as shown on drawings. No change to use, egress or occupancy.
Herewith filing new emergency generator in conjunction with new school occupancy per plans. no change in use, occupancy or egress under this application.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Herewith filing for support of excavation work as per plans
Plumbing work filed in conjunction with GC app M01300828-S1.
Renovation of apt 9b. to create walk in closet and update bathroom. no change to use, occupancy or egress.
Plumbing work filed in conjunction with GC app M01300828-S1.
Renovation of apt 9b. to create walk in closet and update bathroom. no change to use, occupancy or egress.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Interior renovation to apartment 18C. Minor removal and construction of partitions and replace finishes as shown on drawings. No change to use, egress or occupancy.
Facade repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Herewith filing for plumbing modifications in conjunction with new school occupancy.
Herewith filing new emergency generator in conjunction with new school occupancy per plans. no change in use, occupancy or egress under this application.
INTERIOR RENOVATION TO TENANTS' RECREATION FACILITY ON THE 44th FLOOR. WORK TO INCLUDE GENERAL CONSTRUCTION, AS PER PLANS. PLUMBING AND MECHANICAL WORK TO BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS...
Herewith filing for plumbing modifications in conjunction with tunnel connector per plans.
Herewith filing for storm drainage in conjunction with civil scope at rear yard per plans.
Removal and replacement of interior finishes at 1st and 2nd floors
Herewith filing sprinkler modifications in conjunction with tunnel connector to 12 east 89th street per plans.
Installation of industrial rope access for facade inspections.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc