Building Permits in ZIP 10128
Manhattan, NY — 764 permits filed recently
764 permits
Hereby filing for the interior demolition of two existing medical offices (units 1a and 1l) located on the first floor. no change to use occupancy or egress.
Herewith filing mechanical modifications in conjunction with tunnel connector to 12 east 89th street per plans. no change in use, occupancy or egress under this application.
Direct replacement of existing plumbing fixtures with new in bathroom and kitchen at apt 4o, scope of works as shown in plans. no change of egress, occupancy or use.
Interior renovation of existing duplex apt filed in conjunction with dob now pl and mh no change to use, occupancy or egress.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Herewith filing sprinkler modifications in conjunction with connection to 15 east 88th st tunnel per plans.
Front planters reconstruction. no change in use, egress or occupancy.
Propose plumbing modifications for unit 8K
Mh work filed in conjunction with dob now gc and pl. no change to use occupancy or egress
Plywood fence proposed installation of plywood fence as per plan. no change in use, egress or occupancy.
Installation of heavy duty sidewalk shed as per plans. no change in use, egress or occupancy.
Facade renovation modification associated with hvac scope and window replacement. no change to use, egress nor occupancy.
Herewith filing foundation work for new elevator pit per plans. no change in use, occupancy or egress under this application.
Mh work filed in conjunction with dob now gc and pl. no change to use occupancy or egress
Plywood fence proposed installation of plywood fence as per plan. no change in use, egress or occupancy.
Herewith filing foundation work for new elevator pit per plans. no change in use, occupancy or egress under this application.
Facade renovation modification associated with hvac scope and window replacement. no change to use, egress nor occupancy.
Propose plumbing modifications for unit 8K
Installation of heavy duty sidewalk shed as per plans. no change in use, egress or occupancy.
Herewith filing new emergency generator in conjunction with new school occupancy per plans. no change in use, occupancy or egress under this application.