Building Permits in ZIP 10065
Manhattan, NY — 841 permits filed recently
841 permits
This is an interior build-out of a retail space. the proposed construction work shall have new partition walls, electrical work, new millwork, finishes,new lighting & outlets. no plumbing work is prop...
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter # 33 of the nyc code 2022, no changes in use egress or occupancy under this application.
Plumbing work type filing to renovate existing commerical space for sushi bar. no change to existing use, egress or occupancy.
Plumbing work related to the renovation of apartment 5B on the fifth floor.
Installation of new hvac-r systems throughout building for hotel as per plans provided.
Plumbing work type filing to renovate existing commerical space for sushi bar. no change to existing use, egress or occupancy.
Herewith filing for interior renovations of apt 10c and 19b as per plans. no change to use occupancy or egress.
Application filed for new partitions, flooring and ceiling work within apartment hotel as per plans provided. no change to use, egress, bulk, or occupancy.
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter # 33 of the nyc code 2022, no changes in use egress or occupancy under this application.
Installation of new hvac-r systems throughout building for hotel as per plans provided.
Structural renovation and reinforcing of the 2nd floor. Work to include sistering existing joists and adding new beam below second floor with three posts to new footings in cellar.
Proposed garage repairs as per plans filed herewith. there is no change in use, egress or occupancy.
Sprinkler modifications to accommodate IDF equipment room on the 14th floor in the existing Memorial Hospital building including work on floors 12 and 15. All work as per plans filed herewith.
test
Installation oftemporary shoring as per plans filed herewith. there is no change in use, egress or occupancy.
Plumbing work filed in conjunction with dob now gc and mh. no change to use , occupancy or egress.
Herewith filing for plumbing modifications in units 10c and 19b as per plans. no change to use, cocuapncy or egress.
Installation of temporary supported scaffold at rear of the building per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl...
Installation of temporary Site Specific Engineered Enclosure System at rear of building per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occup...
chute will be installed in accordance with approved demolition plans. Mechanical means equipment to be used in accordance with approved demolition plans.