Building Permits in ZIP 10038
Manhattan, NY — 425 permits filed recently
425 permits
Mechanical modifications as per plans filed herewith. installation of commercial cooking and exhaust system in first floor kitchen. no change to use egress or occupancy.
Install new steel tubing at the stairwell between 4th floor and 5th floor for supporting new 2 hour rated partition wall
Filing for Mechanical Systems modification including the removal of existing duct, piping, equipment and the installation of new duct, piping and equipment as shown per plan. No change in use, occupan...
Mechanical work for ARCH on marketing floors 30 & 31 (construction floors 29 & 30)
General construction for ARCH on marketing floors 30 & 31 (construction floors 29 & 30)
Replacement of windows in existing facade openings at 2nd through 11th floors
Installation of pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Replacement of windows in existing facade openings at 2nd through 11th floors
Remove all roofing and flashings down to the roof deck. roof deck to remain, no work. replace all roof drains. replace all bulkhead flashings and associated brick. replace all roof edge fascias. repai...
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary material hoist as per plan. no change in use, egress, or occupancy. the material hoist rack inside the building from the ground floor to the 2nd floor slab.
Plumbing modification as per plans filed herewith. no change to use egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Remove all roofing and flashings down to the roof deck. roof deck to remain, no work. replace all roof drains. replace all bulkhead flashings and associated brick. replace all roof edge fascias. repai...
Installation of temporary material hoist as per plan. no change in use, egress, or occupancy. the material hoist rack inside the building from the ground floor to the 2nd floor slab.
Plumbing modification as per plans filed herewith. no change to use egress or occupancy.
Erect new non-bearing gypsum board demising partition withing single existing bedroom to create two bedrooms. exyend existing ductwork to new bedroom. no change in use, egress or occupancy under this...
Provide steel dunnage for Generator at roof top. Provide slab openings to accommodate ductwork. Provide shaft for oil piping at stair # 1.
Provide steel dunnage for Generator at roof top. Provide slab openings to accommodate ductwork. Provide shaft for oil piping at stair # 1.