Building Permits in ZIP 10038
Manhattan, NY — 425 permits filed recently
425 permits
Erect non-illuminated flush mounted wall sign @pearl street elevation as show on drawings file herewith.
Installation of suspended scaffold and material hoist for exterior facade repairs and facade inspection. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc bc. no chang...
Erect non-illuminated flush mounted wall sign @pearl street elevation as show on drawings file herewith.
Non-illuminated non-advertising accessory sign on marquee permitted under job no: 121997651 - fairfield by marriott. no change of use, egress or occupancy.
Replacement face only of non-illuminated non-advertising double-sided projection accessory sign permitted under job no: 122058995 - fairfield by marriott. no change of use, egress or occupancy.
Non-illuminated non-advertising accessory sign on marquee permitted under job no: 121997651 - fairfield by marriott. no change of use, egress or occupancy.
Installation of suspended scaffold and material hoist for exterior facade repairs and facade inspection. suspended scaffold an material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Installation of suspended scaffold and material hoist for exterior facade repairs and facade inspection. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc bc. no chang...
Non-illuminated non-advertising accessory sign on marquee permitted under job no: 121997651 - fairfield by marriott. no change of use, egress or occupancy.
Fisp inspection via industrial rope access
Interior soft demolition of the existing office as per plans. No change to use, egress or occupancy
Minor renovation of existing commercial space at the first floor proposed wendy's store, relocate and install new plumbing fixtures and associated piping.
Interior soft demolition of the existing office as per plans. No change to use, egress or occupancy
Minor renovation of existing commercial space at the first floor proposed wendy's store, relocate and install new plumbing fixtures and associated piping.
Mechanical work for ARCH on marketing floors 30 & 31 (construction floors 29 & 30)
Filing for Mechanical Systems modification including the removal of existing duct, piping, equipment and the installation of new duct, piping and equipment as shown per plan. No change in use, occupan...
Install new steel tubing at the stairwell between 4th floor and 5th floor for supporting new 2 hour rated partition wall
General construction for ARCH on marketing floors 30 & 31 (construction floors 29 & 30)
Mechanical modifications as per plans filed herewith. installation of commercial cooking and exhaust system in first floor kitchen. no change to use egress or occupancy.
Installation of new mechanical and duct work. no change in use, occupancy or egress.