Building Permits in ZIP 10037
Manhattan, NY — 160 permits filed recently
160 permits
Installation of temporary overhead protection as per plan. no change in use, egress or occupancy.
Decommission of existing tmo site remove equipment platform and dunnage, 9 antennas, 6 rrh from roof. remove cables from cellar, facade and roof. no change in use, egress or occupancy. original app# 1...
Decommission of existing tmo site remove equipment platform and dunnage, 9 antennas, 6 rrh from roof. remove cables from cellar, facade and roof. no change in use, egress or occupancy. original app# 1...
PL: Remove Existing Plumbing Fixtures. Provide new plumbing fixtures and piping. No change in Use, Occupancy, or Egress.
SP: Remove Sprinkler heads, piping, backflow preventer, and provide new. No change in use, occupancy, or egress.
PL: Remove Existing Plumbing Fixtures. Provide new plumbing fixtures and piping. No change in Use, Occupancy, or Egress.
Facade repairs as per plans. No change in egress, use, or occupancy.
Facade repairs as per plans. No change in egress, use, or occupancy.
Mechanical Equipment application filed subsequent to Demolition Application; job number: M01205930-I1.
Mechanical Equipment application filed subsequent to Demolition Application; job number: M01205930-I1.
This application is filed to add 2 pcs bathroom in cellar ,3 pcs bathroom and relocate the kitchen in basement floor . .address violations39101132h and39101133j. no chamge in use egrees and occupancie...
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is front of the building, backyard and courtyard.
Installation of a temporarily supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
Installation of a temporarily supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is front of the building, backyard and courtyard.
Installation of a temporarily supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
This application is filed to add 2 pcs bathroom in cellar ,3 pcs bathroom and relocate the kitchen in basement floor . .address violations39101132h and39101133j. no chamge in use egrees and occupancie...
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the front of the building, back of the building, and courtyard.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the front of the building, back of the building, and courtyard.
Harlem Hospital, MLK Bldg exterior facade & roof level repairs as per the plans filed including: Removal, repairs/replacement of cracked masonry, stone cladding w/metal panel cladding, lintels, gravel...