Building Permits in ZIP 10036
Manhattan, NY — 955 permits filed recently
955 permits
Interior renovation and vertical combination of apt. 1h and 2j. new stair between first and second floor. no change of use, egress or occupancy. combining 2 apartments comply with tppn 03/97.
Interior renovation of the hotel dweling units ( rooms) for accessibility compliance. no change in use egress or occupancy.
Filing for interior renovation in an existing retail space as per the plans filed herewith. No change the use, egress or occupancy.
Modifications and minor demolition of the existing plumbing system on Floors 9, 34, 35, 37, as per plans. No change to use, egress or occupancy.
Installation of roof overhead protection in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Interior renovation of the hotel dweling units ( rooms) for accessibility compliance. no change in use egress or occupancy.
The scope of work is limited to the selective demolition of existing interior non-bearing partitions and associated finishes. no building systems areproposed to be modified or altered as part of this...
Interior renovation and vertical combination of apt. 1h and 2j. new stair between first and second floor. no change of use, egress or occupancy. combining 2 apartments comply with tppn 03/97.
Modifications to the existing sprinkler system, including removals and installation of temp loops, on Floors 9, 34, 35, 36, 37, as per plans. No change to use, egress or occupancy.
Removal plumbing/sprinkler components throughout building as per plans. There is no change in use, egress or occupancy as part of this application.
Interior renovation existing restaurant with partition work on 1st floor. no change in use, egress or occupancy.
Pl work in suite 1100b filed in conjunction with dob now gc. no change to use, occupancy or egress.
Install fire sprinkler system as per plans.
Modifications to the existing plumbing system on the 32nd Floor (Moroccanoil Office) as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the 33rd Floor (Moroccanoil Office) as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system on the 33rd Floor (Moroccanoil Office) as per plans. No change to use, egress, or occupancy.
Installation of pipe scaffold as per plans in compliance with chapter 33 of NYCBC. No change in use, egress, or occupancy
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Additions and modifications to existing plumbing/sprinkler fixtures as per plans filed herewith. No change to use, egress, or occupancy.