Building Permits in ZIP 10036
Manhattan, NY — 945 permits filed recently
945 permits
Modification of existing HVAC system on the 32nd Floor (Moroccanoil Office), including the installation of new units, and associated ducts and piping, as per plans. No change to use, egress, or occupa...
Installation of solar panels on existing roof structure. no change in egress,use, or occupancy.
Replacement of AC units on the cellar and mezzanine level as indicated on drawings.
Modifications and minor demolition of the existing plumbing system on Floors 9, 34, 35, 37, as per plans. No change to use, egress or occupancy.
Interior renovation of the hotel dweling units ( rooms) for accessibility compliance. no change in use egress or occupancy.
Filing for interior renovation in an existing retail space as per the plans filed herewith. No change the use, egress or occupancy.
The scope of work is limited to the selective demolition of existing interior non-bearing partitions and associated finishes. no building systems areproposed to be modified or altered as part of this...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Interior renovation and vertical combination of apt. 1h and 2j. new stair between first and second floor. no change of use, egress or occupancy. combining 2 apartments comply with tppn 03/97.
Removal plumbing/sprinkler components throughout building as per plans. There is no change in use, egress or occupancy as part of this application.
Modifications to the existing sprinkler system, including removals and installation of temp loops, on Floors 9, 34, 35, 36, 37, as per plans. No change to use, egress or occupancy.
Installation of roof overhead protection in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy.
Installation of roof overhead protection in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy.
Modifications to the existing sprinkler system, including removals and installation of temp loops, on Floors 9, 34, 35, 36, 37, as per plans. No change to use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Removal plumbing/sprinkler components throughout building as per plans. There is no change in use, egress or occupancy as part of this application.
Interior renovation of the hotel dweling units ( rooms) for accessibility compliance. no change in use egress or occupancy.
Interior renovation and vertical combination of apt. 1h and 2j. new stair between first and second floor. no change of use, egress or occupancy. combining 2 apartments comply with tppn 03/97.
The scope of work is limited to the selective demolition of existing interior non-bearing partitions and associated finishes. no building systems areproposed to be modified or altered as part of this...
Modifications and minor demolition of the existing plumbing system on Floors 9, 34, 35, 37, as per plans. No change to use, egress or occupancy.