Building Permits in ZIP 10036
Manhattan, NY — 942 permits filed recently
942 permits
Sprinkler work for office fit out for Cumming Group on 12th floor
Install (24) Lavatories, (23) WCs, (6) urinals, (1) DF, (10) FDs, (6) WD/IM, (6) HWHs, (4) sinks and associated CW/sanitary piping on the 5th Floor as per plans (MUFG Renovations.) No change to use, e...
Architectural modifications in support of upgrades to the building facade and interior finish. No change in use, egress or occupancy.
Exterior Facade repair work, as per plans filed.
Filed herewith a temporary 8' wood construction fence
Herewith file to renovate restaurant. work includes new non-load bearing wall, new plumbing fixtures, new floor covering, and general construction. no change in use, egress, and occupancy.
Herewith file for interior demo. for tenant fit-out. work includes removal of non-bearing walls, millwork, ceiling finish, and floor finishes. no change in use, egress, and occupancy
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Mechanical modifications taking place on the 17th floor (18th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
filing plumbing and sprinkler in conjunction jobM01101328-I1
Remove (6) head, install (6) new heads on 17; Remove (7) head, install (7) new heads on 18; Remove (7) head, install (7) new heads on 19; Remove (6) head, install (6) new heads on 20th Flr and associa...
filing plumbing and sprinkler in conjunction jobM01101328-I1
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Herewith file for interior demo. for tenant fit-out. work includes removal of non-bearing walls, millwork, ceiling finish, and floor finishes. no change in use, egress, and occupancy
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Remove (6) head, install (6) new heads on 17; Remove (7) head, install (7) new heads on 18; Remove (7) head, install (7) new heads on 19; Remove (6) head, install (6) new heads on 20th Flr and associa...
Mechanical modifications taking place on the 17th floor (18th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Filing for replacements of two condensing units on the roof with a total capacity of 10 tons. no change to egress, use, or occupancy.
General construction for BMO on marketing floors 15 & 33 (construction floors 14 & 32)