Building Permits in ZIP 10036
Manhattan, NY — 942 permits filed recently
942 permits
Modify plumbing fixtures and related piping as per plans. No change in use, egress or occupancy.
Installation of temporary scaffold enclosure as per plans. no change in use, egress or occupancy.
Removal and Installation of non load bearing partitions as per plans filed herewith. No change in use egress or occupancy. 14th floor construction /15th floor marketing
Installation of temporary scaffold enclosure as per plans. no change in use, egress or occupancy.
Plumbing work filed in conjunction with Alt-CO application
REMOVE EX. 90 TON CHILLER & 2 AIR HANDLERS. INSTALL 2- 60 TON CHILLERS W/ 2 NEW AIR HANDLERS. INSTALL PUMPS W/ PIPING MODIFIACTIONS. INSTALL 10 TON HP W/ 10 AIR HANDLERS. 2- 5 TON HPs. W/ A.H.s 3-TON...
Plumbing work filed in conjunction with interior renovation of the residential units
Remove plumbing fixtures and associated piping. Install new plumbing fixtures and associated CW/sanitary piping on the 17-20th Floors as per plans (Salesforce Restrooms Refresh.) No change to use, egr...
Modification to existing sprinkler system. Installation of sprinkler temp loop. 14th floor construction/15th floor marketing
Suspended scaffold outrigger system for exterior facade restoration work at 636 11 avenue, manhattan, ny 10036.
Installation of Fuel Storage tanks for a diesel-based emergency generator.
Modifications to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy. Work to include new air outlets, re-balancing, and new transfer ducts.
Removal and Installation of non load bearing partitions as per plans filed herewith. No change in use egress or occupancy. 14th floor construction /15th floor marketing
Plumbing application filed in conjunction with Alt-CO application
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
Modify plumbing fixtures and related piping as per plans. No change in use, egress or occupancy.
Architectural modifications in support of upgrades to the building facade and interior finish. No change in use, egress or occupancy.
Install (24) Lavatories, (23) WCs, (6) urinals, (1) DF, (10) FDs, (6) WD/IM, (6) HWHs, (4) sinks and associated CW/sanitary piping on the 5th Floor as per plans (MUFG Renovations.) No change to use, e...
Exterior Facade repair work, as per plans filed.
Filed herewith a temporary 8' wood construction fence