Building Permits in ZIP 10032
Manhattan, NY — 280 permits filed recently
280 permits
Installation of pipe scaffold at 40 haven avenue, manhattan as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of construction fence as per plans in complaince with chaper 33 of NYC BC, no change in use, egress or occupancy
Filing Herewithin Plans and Application For Installation of Temporary Construction Fence. No change in Egress Occupancy or use under This Application.
Interior alteration to existing white box space for medical office at first floor. work includes construction of non-fire-rated partitions and installation of new finishes.
Outrigger for facade repair.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Outrigger for facade repair.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Exterior facade repairs to make the building facade safe. Facade repair work as per the drawings filed. Repair work includes window crown stones repair, windowsill repairs and decorative units repair....
Facade repairs including pinning, hung lintel replacement, and aluminium cladding as per plans; no change to use, egress, or occupancy.
Interior Alteration - Replacing doors, cabinets, lighting, partitions and finishes throughout the office spaces. Removing and installing new walls, adding new ducts throughout. No change in use, egres...
HIP Sprinkler: Partition and ceiling modifications to accommodate the sprinkler upgrades as per plans. No change to use, egress or occupancy.
HIP Sprinkler: Modification of HVAC equipment and ductwork to accommodate sprinkler upgrades as per plans. No change to use, egress or occupancy.
Mechanical work as per plans.
HIP Sprinkler: Modification of HVAC equipment and ductwork to accommodate sprinkler upgrades as per plans. No change to use, egress or occupancy.
Facade repairs including pinning, hung lintel replacement, and aluminium cladding as per plans; no change to use, egress, or occupancy.
Interior Alteration - Replacing doors, cabinets, lighting, partitions and finishes throughout the office spaces. Removing and installing new walls, adding new ducts throughout. No change in use, egres...
Exterior facade repairs to make the building facade safe. Facade repair work as per the drawings filed. Repair work includes window crown stones repair, windowsill repairs and decorative units repair....
HIP Sprinkler: Partition and ceiling modifications to accommodate the sprinkler upgrades as per plans. No change to use, egress or occupancy.
Renovation at existing restaurant. installing new bar, new countertops, new flooring, new interior finishes and new bathroom framing. plumbing to be filed separately. no other work proposed. no change...