Building Permits in ZIP 10032
Manhattan, NY — 284 permits filed recently
284 permits
General interior remodel to existing apartment. no change in use/occupancy, egress, room count/dwelling units.
Air-cooled Condensing unit replacement along with new Interior Air Handling units and associated piping and ductwork to be installed.
General interior remodel to existing apartment. no change in use/occupancy, egress, room count/dwelling units.
Air-cooled Condensing unit replacement along with new Interior Air Handling units and associated piping and ductwork to be installed.
Install medium duty scaffolding as per plans. pipe scaffolding shall comply with chapter 33 of the 2022 nyc building code.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed on the highline (west) elevation, west 13th st. elev. the sidewalk shed at ft washington...
CHNY Ped ED: Sprinkler and Plumbing modifications to accommodate alterations to the Pediatric Emergency Dept. within the existing hospital building. No change to zoning, use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed on the highline (west) elevation, west 13th st. elev. the sidewalk shed at ft washington...
Plumbing work filed in conjunction with alteration CO M00949163-I1.
Heavy duty sidewalk shed for emergency public protection due to bldg fire. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Divide existing apartments on 3rd and 8th floor to create 2 new apartments. no change in bulk or floor area.
Plumbing work filed in conjunction with alteration CO M00949163-I1.
Heavy duty sidewalk shed for emergency public protection due to bldg fire. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Divide existing apartments on 3rd and 8th floor to create 2 new apartments. no change in bulk or floor area.
As per HUB consultation. The expansion project will be designed & classified as an addition to the existing RBSP & will be 9 storiesin height w/ approximately 75,000 sf of NB area. The expansion will...
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed
Installation of temporary overhead protection as per plan. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Herewith filing for replacement of existing flooring, subfloor & trim. Painting of walls and existing hard ceilings, soffits, and built-ins, and trim as per the drawings. No change in use, egress o0r...
As per HUB consultation. The expansion project will be designed & classified as an addition to the existing RBSP & will be 9 storiesin height w/ approximately 75,000 sf of NB area. The expansion will...