Building Permits in ZIP 10032
Manhattan, NY — 280 permits filed recently
280 permits
Mhb gn behavioral health: plumbing and sprinkler modifications to accommodate the behavioral health renovation in the existing hospital building. no change to use, egress or occupancy.
Installation of temporary construction fence as per plans in conjunction with nb construction. no change in use, egress or occupancy. fence shall comply with chapter 33 of nyc building code of 2022.
Installation of suspended scaffold for facade work or inspection.
Mhb gn behavioral health: plumbing and sprinkler modifications to accommodate the behavioral health renovation in the existing hospital building. no change to use, egress or occupancy.
Interior renovation of the existing dental office: removal/installation of non-load-bearing interior partitions, cosmetic finishes for the floor, walls, and ceiling. No change in egress, occupancy, or...
Filing for the installation of: one 1.75 ton heat pump unit, one (1 ) ton air handler unit, one 0.75 ton air handler unit. no change in use, egress, or occupancy.
Chny central sp: sprinkler modifications throughout the existing babies hospital central building as indicated on plans filed herewith.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy.
Chny central sp: sprinkler modifications throughout the existing babies hospital central building as indicated on plans filed herewith.
Filing for the installation of: one 1.75 ton heat pump unit, one (1 ) ton air handler unit, one 0.75 ton air handler unit. no change in use, egress, or occupancy.
Interior renovation of the existing dental office: removal/installation of non-load-bearing interior partitions, cosmetic finishes for the floor, walls, and ceiling. No change in egress, occupancy, or...
Initial rope access cd5 fisp. inspection
HP SP: Modifications to ceilings and finishes to accommodate alterations for the sprinkler upgrades within the existing hospital building as per plans.
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy.
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy.
HP SP: Modifications to ceilings and finishes to accommodate alterations for the sprinkler upgrades within the existing hospital building as per plans.
Proposed installation of pipe scaffold for remedial repairs as per plans. pipe scaffold shall comply with chapter#33 of 2014 the ny building code. no change in use occupancy or egress under this appli...
Proposed of brick replacement, re-point mortar and window sil to be done as needed as per plans. no change in use occupancy or egress under this application.
Proposed of brick replacement, re-point mortar and window sil to be done as needed as per plans. no change in use occupancy or egress under this application.