Building Permits in ZIP 10027
Manhattan, NY — 536 permits filed recently
536 permits
Plumbing work filed as per plan provided.
Convert funeral parlor with two (2 ) dwelling units to a two (2) family within an existing 5 story with cellar brownstone building. includes interior & exterior renovations and proposed roof bulkhead...
Heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
File suspended scaffold outrigger systems for facade restoration and inspection
File suspended scaffold outrigger systems for facade restoration and inspection
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Plumbing work filed as per plan provided.
Convert funeral parlor with two (2 ) dwelling units to a two (2) family within an existing 5 story with cellar brownstone building. includes interior & exterior renovations and proposed roof bulkhead...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
File suspended scaffold outrigger systems for facade restoration and inspection
File suspended scaffold outrigger systems for facade restoration and inspection
Plumbing work filed in conjunction with GC application. No change to use, egress or occupancy.
Plumbing work filed in conjunction with the gc application. no change to use, egress or occupancy.
Installation of construction fence for public protection from areas of exposure during construction work
Installation of temporary suspended scaffold equipment.
Installation of temporary suspended scaffold equipment.
Installation of construction fence for public protection from areas of exposure during construction work
Plumbing work filed in conjunction with GC application. No change to use, egress or occupancy.