Building Permits in ZIP 10027
Manhattan, NY — 536 permits filed recently
536 permits
Filing herewith foundation work and minor structural work as per plans. no change in use, egress or occupancy.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Subsequent structural filing. removal and reconfiguration of interior wall on all levels. removal of columns in cellar and restructuring of basement floor. removal of basement and 1st floor rear facad...
File suspended scaffold outrigger systems for facade restoration and inspection.
Filing herewith for a moderate rehabilitation of an existing residential apartment building as per plans. no change in use, egress, or occupancy.
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Enmanuel Martinez Ortiz
Subsequent mechanical scope including installation of vrf heat pump system, refrigerant and condensate system, toilet exhaust system, and all associated ducts and piping. no change in use, egress or o...
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Jose Chauca
Support of excavation work as per plans filed
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Enmanuel Martinez Ortiz
Subsequent mechanical scope including installation of vrf heat pump system, refrigerant and condensate system, toilet exhaust system, and all associated ducts and piping. no change in use, egress or o...
Support of excavation work as per plans filed
Filing herewith for a moderate rehabilitation of an existing residential apartment building as per plans. no change in use, egress, or occupancy.
Installation of temporary roof protection as per plan. no change in use, egress or occupancy.
Structural wood framing repairs on the cellar and first floor due to fire damage as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Addition and modification to exsiting sprinkler system as shown herewith. no changes to egress, occupancy or use
Structural wood framing repairs on the cellar and first floor due to fire damage as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Installation of temporary roof protection as per plan. no change in use, egress or occupancy.
Addition and modification to exsiting sprinkler system as shown herewith. no changes to egress, occupancy or use
File suspended scaffold outrigger systems for facade restoration and inspection