Building Permits in ZIP 10025
Manhattan, NY — 729 permits filed recently
729 permits
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Replace rooftop kitchen exhaust fan as per plans. no change in use, egress or occupancy.
Filing to obtain certificate of compliance for (1) ac unit installed on the roof under previously approved bis application.
Installation and use of temporary mini crane as per plans filed herewith. no change in use, egress, or occupancy.
Associated plumbing work including water & sanitary piping, drains, and sprinkler heads for the installation of a new laundry area in an existing accessory space at the cellar floor only. no change of...
Interior apartment renovation of Apartment 24G per submitted plans. No change in use, egress or occupancy
Interior renovation of unit 5d within existing multi-family building. no increase in the bulk . no impact on zoning. no change in use, egress, or occupancy.
Ll11 repair of facades for existing building as per plans. no change in use, egress or occupancy.
Installation of temporary suspended scaffold equipment
Renovation of Bathroom # 2 in Apt 11D. Replace Tub & Toilet and general finishes. No change in Use, Egress or Occupancy.
Facade and parking garage repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
Installation of new sheetrock as shown on plans filed herewith.
Associated plumbing work including water & sanitary piping, drains, and sprinkler heads for the installation of a new laundry area in an existing accessory space at the cellar floor only. no change of...
Associated plumbing work including water & sanitary piping, drains, and sprinkler heads for the installation of a new laundry area in an existing accessory space at the cellar floor only. no change of...
Interior renovation of unit 5d within existing multi-family building. no increase in the bulk . no impact on zoning. no change in use, egress, or occupancy.
Facade and parking garage repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
Installation of temporary suspended scaffold equipment
Interior apartment renovation of Apartment 24G per submitted plans. No change in use, egress or occupancy
Renovation of Bathroom # 2 in Apt 11D. Replace Tub & Toilet and general finishes. No change in Use, Egress or Occupancy.
Ll11 repair of facades for existing building as per plans. no change in use, egress or occupancy.