Building Permits in ZIP 10025
Manhattan, NY — 723 permits filed recently
723 permits
Combination apt 1 with cellar. renovation. no change of use, egress or occupancy.
Facade repairs no change in use egress or occupancy
installation of pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Facade repairs no change in use egress or occupancy
Removal and installation of interior non-load bearingpartitions, doors and associated finishes. no changein use, occupancy or egress.
Combination apt 1 with cellar. renovation. no change of use, egress or occupancy.
Interior renovation in apt2c. remove and construct non-bearing or non-structural partitions. all work as per plan. no change in use, egress of occupancy.
Inspection and Facade Repairs
Replace Tub & Toilet in Bath # 2 of Apt 11D. No change in Use, Egress or Occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Remove , replace , relocate and install new plumbing fixtures in conjunction with the combination of apt 14A and 14B on the 14 floor . GC filed under application M01106813-I1. All as per plan no chang...
Filing to obtain certificate of compliance for (1) ac unit installed on the roof under previously approved bis application.
Replace rooftop kitchen exhaust fan as per plans. no change in use, egress or occupancy.
Interior renovations as per plans. no change to use, egress, and/or occupancy
Replace rooftop kitchen exhaust fan as per plans. no change in use, egress or occupancy.
Installation and use of temporary mini crane as per plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Filing to obtain certificate of compliance for (1) ac unit installed on the roof under previously approved bis application.
Installation of temporary suspended scaffold equipment
Renovation of Bathroom # 2 in Apt 11D. Replace Tub & Toilet and general finishes. No change in Use, Egress or Occupancy.