Building Permits in ZIP 10023
Manhattan, NY — 1,034 permits filed recently
1,034 permits
Plumbing work type as per plans
Proposed structural modification of an existing concrete shear wall to accommodate a new door opening.
Mechanical work in conjunction with interior renovation of Apartment 2B Job No. M01313254-I1. Work includes addition of one exhaust vent in bathroom. No change in use, egress, or occupancy.
Interior renovation of existing office space, partitions and drop ceilings on the 14 floor (14 fl marketed as 15) as per plans filed no change in use occupancy or egress
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Modifications to existing structural dunnage framing at the basement and roof level to accommodate mechanical unit support.
Application filed for interior modification and elevator modernization as per plan. no change in use, egress or occupancy.
Installation of a temporarily supported scaffold, overhead and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
Installation of temporary roof protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Use of mechanical demolition equipment during Phase 1 Damrosch Park alteration, filed separately under M01346293.
Installation of temporary roof protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Use of Mechanical demolition equipment during partial demolition, filed separately under M01299014-S5.
Plumbing work type as per plans
Interior renovation of existing office space, partitions and drop ceilings on the 14 floor (14 fl marketed as 15) as per plans filed no change in use occupancy or egress
Remove existing and replace with new roof mounted cooling tower, exhaust fan in penthouse, chiller in basement and water pumps in basement., and Install new associate piping as shown on drawings.
Proposed structural modification of an existing concrete shear wall to accommodate a new door opening.
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Modifications to existing structural dunnage framing at the basement and roof level to accommodate mechanical unit support.
Application filed for interior modification and elevator modernization as per plan. no change in use, egress or occupancy.
Mechanical work in conjunction with interior renovation of Apartment 2B Job No. M01313254-I1. Work includes addition of one exhaust vent in bathroom. No change in use, egress, or occupancy.