Building Permits in ZIP 10019
Manhattan, NY — 1,289 permits filed recently
1,289 permits
Interior demolition and alteration including installation of non-load-bearing partitions, ceiling and related finishes. No change to egress, use, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of six (6) in-row A/C units, one (1) outdoor adiabatic cooler, and associated piping. New BMS controls system.
Sprinkler modifications to take place on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
Infill of existing slab opening at 23rd floor.
General construction work for Interior fit out on 19th floor (23rd floor marketing). Filed in conjunction with HUB Development NB Job # 121206550 reviewed under 2014 code..
Mechanical work as shown on plans
plumbing modifications on 11th floor as per plans filed herewith. no changes in use, egress or occupancy.
General construction modifications taking place on the 12th floor as per drawings filed herewith. no change in use, egress or occupancy.
Herewith filing interior alterations to an existing commercial space at 1st and 2nd floor, as per plans submitted. No change to use, egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
General construction modifications taking place on the 12th floor as per drawings filed herewith. no change in use, egress or occupancy.
Sprinkler modifications to take place on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
Modification to an existing Sprinkler System
Infill of existing slab opening at 23rd floor.
Filing for modifications to existing plumbing systems at cellar and first floor. There is no change to use, egress or occupancy.
plumbing modifications on 11th floor as per plans filed herewith. no changes in use, egress or occupancy.
Plumbing - Remove existing bathroom plumbing fixtures and provide new. Provide two additional sinks
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Mechanical work as shown on plans