Building Permits in ZIP 10019
Manhattan, NY — 1,289 permits filed recently
1,289 permits
General renovations consisting of demolition and construction at Rooftop Bar, Lounge, Kitchen, Back of house spaces and Marquee at existing Hotel
General construction modifications as per plans filed herewith. No change in use, egress or occupancy.
Install AC split system & associated ducting and diffusers for renovation of residential lobby at 1st floor. Work is in conjunction with M01006382.
Mechanical modifications as per plans filed herewith. No change in use, egress or occupancy.
Mechanical modifications taking place on the 12th floor as per drawings filed herewith. no change in use, egress or occupancy.
General renovations consisting of demolition and construction at Rooftop Bar, Lounge, Kitchen, Back of house spaces and Marquee at existing Hotel
facade inspections
General construction modifications as per plans filed herewith. No change in use, egress or occupancy.
Subsequent is filed only for compliance with energy conservation for lighting
Application filed for mechanical additions/modifications on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Facade repairs as per plans. No change to use, egress or occupancy.
Repair of existing fire rated walls in common hallways
Plumbing & sprinkler modifications as per plans filed herewith. No change to use, egress, or occupancy.
Modification and installation of plumbing fixtures, and replacement of gas range with gas cooktop.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Facade repairs as shown on the drawings filed herewith. no change in use, egress or occupancy.
Installation of six (6) in-row A/C units, one (1) outdoor adiabatic cooler, and associated piping. New BMS controls system.
General construction modifications taking place on the 12th floor as per drawings filed herewith. no change in use, egress or occupancy.
Interior demolition and alteration including installation of non-load-bearing partitions, ceiling and related finishes. No change to egress, use, or occupancy.
Infill of existing slab opening at 23rd floor.