Erect exterior wall structure for signs as per plan. signs filed under separate application numbers. no change in use, egress or occupancy.
Interior renovation of the existing 6th floor as per submitted plans.
Mechanical filing for ductwork & FPBs on the 11 floor tenant space.
Seyfarth Shaw-- Modifications to existing sprinkler system on parts of the 31st, 32nd, and 33rd floors.
Proposed exterior facade repair (parapet, lintel, caulking, brick replacement, masonry, mortar joint pointing) no structural changes as per plans. no change in use egress or occupancy. related to loca...
Filing herewith drawings indicating the replacement of a Sprinkler Fire Department Siamese connection. No change in use, egress, or occupancy under this application.
Structural modifications to floor 1 as per plans filed herewith. No change in use, egress or occupancy.
Installation of temporary suspended scaffold equipment.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Erect exterior wall structure for signs as per plan. signs filed under separate application numbers. no change in use, egress or occupancy.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Mechanical filing for ductwork & FPBs on the 11 floor tenant space.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Installation and modification of plumbing fixtures and sprinkler heads with pipes.
Interior renovation of the existing 6th floor as per submitted plans.
Filing for facade repairs work that includes replacement of precast concrete window sill(s), replacement of cracked brickwork, replacement of terracotta copings, repair of eroded mortar joints, and mi...
Sprinkler modifications to the 16th floor as per plans filed herewith. No change in use, egress, or occupancy.
Renovation and vertical enlargement of existing office building to self service storage facility. app filed in conj w/m01004304-i1 (fo), m01003551-s1 (st), m01003551-s2 (ms), m01003551-s3 (pl_, m01003...
This project involves the combination of apartments. work shall comply with technical policy & procedure notice (tppn) #3/97 combining apartments to create larger residential units without affecting t...
General construction for new rooftop amenity on roof and bulkhead